Snags and inspections on site

The Snags tab of the Site app (/site/snags) is the record of quality observations, inspections and close-out for the selected project. Screens are laid out for a phone.

Add a snag

  1. Open Site, choose the project, and select Snags in the bottom bar. Make sure Snags (not Instructions) is selected, then Snags (not Inspections) in the list switch.
  2. Select Add a snag.
  3. Type the Description. Add a Photo (optional), Location (for example Level 2, east stair) and Element (for example Fire door).
  4. Choose a Priority (Low, Medium, High, Urgent) and a Due date.
  5. If it is a serious fault, complete the Non-conformance report section: Source, Root cause, Corrective action, Corrective action owner and Corrective action due date.
  6. Select Create snag. Use Edit then Save changes later. An NCR needs a Close-out note, with a photo or document, before it can close.

Record an inspection

  1. Switch to Inspections and select New inspection.
  2. Enter the Inspection title (for example First fix review) and Inspection date.
  3. Select Create inspection.
  4. Where the project has inspection and test plans, select Record inspection against a point and complete Result, Inspector and Body, then Save result. Tick the box to raise an NCR instead of a plain snag.

Use the NCR register filters (Disposition, Status) to narrow the list. On a computer, the project's Inspections page holds inspection stages, approval routes, results and certificates.

What happens in Xero

Nothing is sent to Xero.